Free Remodeling Estimate Template (2026)

A ready-to-use remodeling estimate template for kitchens, bathrooms, and whole-room renovations. Break the project into demo, trades, and finishes with clear allowances — and make the change-order process a signature, not a phone call.

Sample remodeling estimate

Line itemQtyUnitUnit priceAmount
Demolition of existing kitchen, incl. debris removal1job$1,800.00$1,800.00
Install semi-custom cabinets12linear ft$450.00$5,400.00
Quartz countertop, fabricated & installed45sq ft$85.00$3,825.00
Rough-in & finish plumbing and electrical1job$3,200.00$3,200.00
Tile backsplash installation (materials + labor)40sq ft$28.00$1,120.00
Total$15,345.00

Download CSV template

Rates shown are sample US market figures for illustration — always price to your own market, license level, and warranty policy.

How to use this template

  1. Download the CSV and replace the sample lines with your own scope of work.
  2. Fill in your business details, license number, and payment terms.
  3. Add an expiration date — prices for materials move, and 30 days is standard.
  4. Walk the customer through every line on site, then get a signature before you leave.

Or skip the spreadsheet entirely

QuoteSeal builds this same itemized quote on your phone in minutes, captures the customer's signature on site, attaches job photos as evidence, and turns the approved quote into an invoice and PDF. Free for your first 10 quotes — no credit card required.

Try QuoteSeal free

Remodeling estimate FAQ

What should a remodeling estimate include?

Room-by-room scope, demolition and disposal, allowances for customer-selected finishes (cabinets, counters, tile), trade work broken out, permit costs, a payment schedule tied to milestones, a timeline with start date, and a signature line. Allowances are where remodel budgets explode — define the dollar amount and what happens when selections exceed it.

How should I handle change orders on a remodel?

Never do verbal changes. Price the change, write it up, and get a fresh signature before the work happens — on a phone it takes two minutes. Every 'while you're at it' that skips this step comes back as a dispute at final payment. QuoteSeal makes the new signature a two-minute task on site.

What deposit should a remodeler collect?

Follow your state's rules — several states cap deposits (California, for example, limits them to $1,000 or 10%). Beyond compliance, tie payments to milestones: demo complete, rough-in passed, cabinets set. A signed payment schedule protects your cash flow and reassures the customer at the same time.